Construction planning and project management software.
Construction & Built Environment case study
A construction planning platform built around programme control, collaboration, and visual reporting.
Asta Powerproject is positioned by Elecosoft as planning and project management software for construction teams that need intuitive scheduling, visual reporting, 4D BIM integration, mobile access, and resource management. Eleco Technologies' product-development work is represented here as a product case study grounded in the public product evidence.
Stated on product source page
Schedule + model visualisation
App for on-site programme updates
Gantt + scenario planning
Professionals worldwide stated on the source product page.
Planning, mobile, reporting, resource, and BIM-connected workflows.
Client challenge
What the organisation needed to solve
Construction delivery teams need to manage complex programmes, resources, calendars, costs, dashboards, and stakeholder reporting without losing sight of critical path decisions. Generic planning tools rarely reflect how construction programmes, task pools, code libraries, field updates, and BIM-informed planning need to work together.
Eleco Technologies solution
How the platform addressed the problem
The product experience centres on construction-specific planning workflows: scheduling, Gantt views, scenario planning, task pools, critical path analysis, dashboards, reports, resource and cost management, mobile app access, and 4D BIM integration. The result is a planning environment designed for construction programme visibility rather than generic project administration.
Delivery model
Structured engineering delivery with clear team, timeline, and stack evidence.
Team composition
Product engineering contribution
Construction-domain workflow design
Planning, reporting, and integration capability development
Delivery approach
Modelled the case study around construction-specific planning concepts, including task structures, code libraries, calendars, resources, costs, and programme reporting.
Emphasised product workflows that connect office planning, mobile access, visual reporting, and BIM-informed schedule communication.
Kept public claims tied to the product source page, including the stated worldwide professional user base and construction-focused capability set.
Technology stack
Measured outcomes
Operational results that make the engagement commercially credible.
Supported construction teams with a planning platform described as purpose-built for construction project management.
Connected visual scheduling, professional reporting, 4D BIM integration, mobile access, and resource management in one product story.
Public product material states that Asta Powerproject supports more than 100,000 professionals worldwide.
Evidence points
What the delivered system included
Intuitive scheduling, Gantt charts, and critical path analysis
4D BIM integration, mobile app access, dashboards, and professional reporting
Task pools, code libraries, calendars, resource management, and cost visibility
Engineering Delivery Review
Turn evidence from similar work into a practical delivery plan.
If your organisation is planning a platform build, modernisation, internal workflow system, or AI-ready automation layer, Eleco Technologies can review the opportunity, risks, team model, and first delivery phase.